Prepare for the RBQ examination for subclass 1.4, Contractor – roads and mains: 41 lessons, 694 quiz questions across the eight sections of the exam, plus a navigation quiz of 45 questions in the Safety Code for the construction industry, the only document provided in the exam room.
What the RBQ 1.4 exam covers
3 hours, multiple-choice questions, passing grade of 60%, in French or English. Eight sections: definitions and principles; types of civil engineering structures authorized; legislative, regulatory and normative framework; phases of execution of a project; strength of materials and load transfer; plans and specifications; cost estimates and bids; prevention management. Document provided in the exam room:
- Safety Code for the construction industry (chapter S-2.1, r. 4)
Recommended by the exam information sheet, but not provided (among others):
- Building Act (chapter B-1.1)
- Regulation respecting the professional qualification of contractors and owner-builders (chapter B-1.1, r. 9)
- Environment Quality Act (chapter Q-2) and its regulations
- Act respecting roads (chapter V-9) and Highway Safety Code (chapter C-24.2)
- Regulation respecting concrete pumps and distribution masts (chapter S-2.1, r. 9)
In the document provided, the course teaches you to find the division and the section quickly; what comes from the texts that are not provided is learned before the exam. The course teaches the law in force, including where the exam information sheet cites repealed or replaced texts.
What the course includes
- 41 lessons, from soils and road materials to the legislative framework, the execution of pavements, pipes, railway tracks and tunnels, plans and specifications, quantity takeoff and prevention, with figures, objectives, “Test yourself” questions and a quick reference for each section
- 694 quiz questions, including 151 with an image, in eight randomly drawn section quizzes
- a timed navigation quiz in the Safety Code for the construction industry (15 questions drawn from 45, in 20 minutes)
- the method adapted to a closed-book exam where only one document is provided, as essentials and as a complete guide
- a study plan with spaced retakes
- 347 flashcards drawn from the lessons
- an audio capsule for each lesson and a capsule on the method
- audio flashcards to review while listening
Site rules, not generalities
Examples taken from the Cahier des charges et devis généraux – Infrastructures routières – Construction et réparation, 2026 edition (General Specifications – Road Infrastructure – Construction and Repair), referred to as the CCDG 2026, of the Ministère des Transports et de la Mobilité durable (MTMD), to be applied according to the contract documents of the project, and from the Safety Code for the construction industry.
The bottom of a footing. The bottom of a footing must offer a uniform bearing capacity: unstable soils are stabilized or replaced. For a structure built neither on piles nor on rock, the last 500 millimetres are excavated with a smooth-lip bucket (without teeth), just before the footing formwork is set up, on a bottom that is neither disturbed nor frozen (CCDG 2026, Article 15.2.5.3.2).
Installing a culvert. The elements are placed starting from the downstream end, with clean joints; for pipes, a geotextile strip 1 m wide is pulled tight around the joints, placed before the elements are set in place; the deformation of steel or polyethylene pipes is measured during backfilling and at the end (CCDG 2026, Articles 15.13.5 and following).
The dimension figure takes precedence over the scale. On a plan, dimension figures take precedence over measurements taken to scale (CCDG 2026, Article 2.3). A benchmark or a reference point destroyed or damaged during the work is replaced at the contractor’s expense (Article 5.3.1).
Class 2 excavation. Nothing is paid outside the lines of the plans and specifications, except in two cases measured on site: Class 1 excavation found locally, and an extra width or an additional depth decided by the MTMD (CCDG 2026, Article 11.4.5.4). Swell is used to plan hauling: the capacity of a truck is compared with the loose volume, and a partial trip is still a trip.
Crystalline silica dust. When work on a material presumed to contain crystalline silica is liable to produce dust emissions, the Safety Code for the construction industry requires at least one control measure (s. 3.25.4); a protective respiratory apparatus may also be required under s. 3.25.6. In the delimited area of this work, cleaning, including that of the equipment, is done by wetting or with a vacuum cleaner equipped with a high-efficiency filter; dry sweeping and compressed air are prohibited (s. 3.25.10).
Frequently asked questions
Which documents are provided at the RBQ 1.4 exam?
Only one: the Safety Code for the construction industry (chapter S-2.1, r. 4). The 26 other documents of the exam information sheet are recommended reading, not provided: what comes from them is learned before the exam. Only the documents and materials provided by the invigilator may be used.
How long is the exam and what is the passing grade?
The RBQ examination for subclass 1.4 lasts 3 hours; the questions are multiple-choice and the passing grade is 60%. It can be taken in French or English.
What does subclass 1.4 cover?
Subclass 1.4, Contractor – roads and mains, authorizes construction work relating to roads and public thoroughfares, sewers, water mains, pipelines, railroad structures and tunnels. It also authorizes the work in subclasses 3.1, 4.1, 5.1 and 6.1 when it relates to one of these civil engineering structures, the work in subclass 1.6 only to have it carried out, and similar or related work, except work reserved exclusively for master pipe-mechanics and electrical contractors; related work authorized by the subclass must be carried out at the same time as work in that subclass (Regulation respecting the professional qualification of contractors and owner-builders, Schedule I; s. 11).
Do bridges fall under subclass 1.4?
No. Bridges, viaducts and footbridges fall under subclass 1.5: a footbridge in a park is still a bridge (Regulation respecting the professional qualification of contractors and owner-builders, Schedule I, 1.5, and Schedule IV).
Does the course follow the texts named in the exam information sheet?
It teaches the law in force. The exam information sheet still cites the Protection Policy for Lakeshores, Riverbanks, Littoral Zones and Floodplains (chapter Q-2, r. 35), repealed on 1 March 2022: the course teaches the bodies of water framework in force since 1 March 2026. For the Safety Code for the construction industry, the only document provided, one rule applies. Values are found in the document, not memorized. At the exam, the copy provided governs (it may be a different edition); on the job site, the edition in force in Québec applies.
What must be done before digging near underground piping?
Before digging, the employer verifies whether there is underground piping within the perimeter of the works and, if so, situates its exact location on the ground (Safety Code for the construction industry, s. 3.15.1(1)). The RBQ asks that the request, which is free, be filed with Info-Excavation at least 4 working days before the work begins: this is a guideline, not a regulation, and it is learned before the exam.
Must a trench always be shored?
Shoring is done in accordance with the plans and specifications of an engineer, except in the three cases listed in s. 3.15.3(1) of the Safety Code for the construction industry; the banks are inspected and maintained, and the shoring is removed from the bottom upwards, only in places to which workers no longer have access.
Which prevention mechanisms apply on a civil engineering site?
The Act respecting occupational health and safety (chapter S-2.1), which is not provided at the exam, sets thresholds according to the number of construction workers whom the activities are foreseen to occupy simultaneously at a stage of the work: prevention program from 10 (s. 198), job-site committee from 20 (s. 204), health and safety representative from 10 (s. 209), health and safety coordinator from 100 or according to the cost of the work (s. 215.1). These thresholds are learned before the exam.
Does the course include calculations?
Yes: grading, stress and moment, quantity takeoff of earthwork and granular materials, swell and number of truck trips, conversions between tonnes and cubic metres, cost estimating and bid analysis. The section quizzes include these calculations with other numbers.
Is the MTMD’s CCDG provided at the exam?
No. The course draws on the Cahier des charges et devis généraux – Infrastructures routières – Construction et réparation, 2026 edition (General Specifications – Road Infrastructure – Construction and Repair), referred to as the CCDG 2026, of the Ministère des Transports et de la Mobilité durable (MTMD), for the execution of the work, quality control and the method of payment; what the course teaches from it is learned before the exam, since it is not provided.
Which part of the course is free?
The free section includes the study plan, the “essentials” method, lessons 1 and 2, a quiz of 14 sample questions on the eight sections and the audio capsule for lesson 1.
Does the course include flashcards and audio capsules?
Yes: 347 flashcards drawn from the lessons, an audio capsule for each lesson, a capsule on the method, and audio flashcards to review while listening.
Is Prof-RBQ.ca linked to the RBQ?
Prof-RBQ.ca is an independent exam-preparation centre with no ties to the RBQ or the CCQ. The course does not replace the official texts or the advice of a professional; in case of discrepancy, the official text governs.